Quick
Ready-made permit drawings for most of the country can be delivered in 10 days and material ready for installation within 4 weeks.
Easy
The construction schedule is simplified since the steel subcontractor does not have to be on site while the concrete subcontractor pours the footings.
Clean
Clean finish for maximum parking square footage for both straight and 60 degree angled implementations.
Scalable
Modular design is engineered with 4-18 bays and up to 32 space and easily configured to best suit property.
Sustainable
Made from 100% recycled materials with optional solar panel designs, the canopy extends the useful life and cost of ownership.
Why Shade Caster?
- Cost-effective solution
- Quick to assemble and install
- Minimum maintenance
- Maximize land space efficiencies